1 | ORIENTATION: Announcement of the subject, Introducing the project to be worked on, Explaining the preparatory work.
Making metaphor and architectural style choices.
PREPARATORY WORKS: Architectural Program including area calculations, Bubble Diagram, Adjacency Matrix, Zoning Diagrams Semantic Differential Table and Color Palette, Concept Sheet |
2 | ORIENTATION: Announcement of the subject, Introducing the project to be worked on, Explaining the preparatory work.
Making metaphor and architectural style choices.
PREPARATORY WORKS: Architectural Program including area calculations, Bubble Diagram, Adjacency Matrix, Zoning Diagrams Semantic Differential Table and Color Palette, Concept Sheet |
3 | HAZIRLIK ÇALIŞMALARININ TESLİMİ-(Preliminary Research)
SUNUM ve AÇIK ELEŞTİRİ TOPLANTISI (4.a). |
4 | AVAN PROJECT: REFUNCTIONAL
1/200 Furnished "Space Organization Study" presentation of the entire building. |
5 | Designing Architectural Elements: Main entrance, Floor, Ceiling, Vertical surfaces, Gallery space, Main space fronting, Column, Stairlift, Furniture, and Integrated interior design |
6 | Designing Architectural Elements: Main entrance, Floor, Ceiling, Vertical surfaces, Gallery space, Main space fronting, Column, Stairlift, Furniture and Integrated interior design |
7 | SKETCH STUDY BEFORE THE MIDTERM TERM (4C): 1. Resolving the wall, floor, and ceiling surfaces of the selected area together with the furniture.
1/50 Technical and Furnished plans
1/50 Floor Plan, suspended ceiling, and Ceiling Lighting Plans
1/50 two vertically furnished sections (passing through stairs, doors and windows) and Storyboard Study
2. Interim Submission (Jury): INTERMEDIATE DELIVERY (4B) PRESENTATION AND OPEN CRITICAL MEETING (4H): What is required for the interim delivery
1. Selected Area:
1/50 Technical and Furnished plan
1/50 Floor Plan,
1/50 Suspended ceiling and Lighting Plan;
1/50 two furnished vertical sections (passing through stairs, doors and windows),
Architectural Elements sheet,
Sample Board,
storyboard
2.Determining the selected area |
8 | MIDTERM EXAM WEEK |
9 | 2. Selected Area Criticism of Project Studies: 2. Analysis of the selected area's wall, ceiling, and ceiling surfaces together with the furniture.
1/50 Technical and Furnished plans
1/50 Floor Plan, suspended ceiling, and Ceiling Lighting Plans
1/50 two furnishing vertical sections (passing through stairs, doors, and windows)
2.Resolving the wall and ceiling surfaces of the selected area together with the furniture.
Storyboard Work |
10 | 2. Selected Area Criticism of Project Studies: 2. Analysis of the selected area's wall, ceiling, and ceiling surfaces together with the furniture.
1/50 Technical and Furnished plans
1/50 Floor Plan, suspended ceiling, and Ceiling Lighting Plans
1/50 two furnishing vertical sections (passing through stairs, doors, and windows)
2.Resolving the wall and ceiling surfaces of the selected area together with the furniture.
Storyboard Work |
11 | 2. Selected Area Criticism of Project Studies: 2. Analysis of the selected area's wall, ceiling, and ceiling surfaces together with the furniture.
1/50 Technical and Furnished plans
1/50 Floor Plan, suspended ceiling, and Ceiling Lighting Plans
1/50 two furnishing vertical sections (passing through stairs, doors, and windows)
2.Resolving the wall and ceiling surfaces of the selected area together with the furniture.
Storyboard Work |
12 | 2. Selected Area Criticism of Project Studies: 2. Analysis of the selected area's wall, ceiling, and ceiling surfaces together with the furniture.
1/50 Technical and Furnished plans
1/50 Floor Plan, suspended ceiling, and Ceiling Lighting Plans
1/50 two vertical furnishing sections (passing through stairs, doors, and windows), and
Storyboard Work |
13 | 3. INTERMEDIATE JURY (4b): What is required for the interim delivery
2. Selected Area:
1/50 Technical and Furnished plan
1/50 Floor Plan,
1/50 Suspended ceiling and Lighting Plan;
1/50 two furnished vertical sections (passing through stairs, doors, and windows),
Architectural Elements sheet,
Sample Board,
storyboard |
14 | SKETCH STUDY BEFORE THE 3rd FINAL EXAM (4e): PREPARATION AND PRESENTATION OF THE PROJECTS DONE ACCORDING TO THE DELIVERY STANDARDS
{All the preparatory works, 1/200 the furnished plan and sections of the whole building, all the works related to the 1st and 2nd selected areas. PDF booklet containing all the works.
INTERMEDIATE DELIVERY BEFORE THE FINAL EXAM PERIOD (4D) PRESENTATION AND
OPEN CRITICAL MEETINGS (4H): STUDENT DEFENSE BEFORE FINAL DELIVERY |