1 | Economic analysis of engineering and managerial decision making |
2 | Economic analysis of engineering and managerial decision making |
3 | Economic analysis of engineering and managerial decision making |
4 | Cash flow, the effect of time and interest rate on money and physical assets |
5 | Cash flow, the effect of time and interest rate on money and physical assets |
6 | Cash flow, the effect of time and interest rate on money and physical assets |
7 | Alternative methods of assessment |
8 | Midterm exam |
9 | The present value, future value, annual value |
10 | Return and benefit, cost ratios |
11 | Depreciation and tax |
12 | The effect of inflation in construction projects |
13 | The effect of inflation in construction projects |
14 | Overall assessment |